LIVE CITY DATA
Vision: Quality and integrity, technology, environmental stewardship, the Sufficiency Economy Philosophy, thriving culture and readiness for ASEAN.
Mae Na Chon Subdistrict Administrative OrganizationMae Chaem District, Chiang Mai Province
หน้าหลัก Procurement Successful Bidder Announcement The construction of the reinforced concrete road in Ban Mae Malong, 9th Block, Mae Na Chon Subdistrict, with a traffic surface width of 4.00 meters, length of 75.00 meters and average thickness of 0.15 meters, or a total concrete area of not less than 300.00 square meters.

The construction of the reinforced concrete road in Ban Mae Malong, 9th Block, Mae Na Chon Subdistrict, with a traffic surface width of 4.00 meters, length of 75.00 meters and average thickness of 0.15 meters, or a total concrete area of not less than 300.00 square meters.

Announcement: 7 Feb 2022 54
ค้นหา/เลื่อนหน้า PDF
กำลังโหลด...

กำลังโหลด PDF...

เอกสารที่เกี่ยวข้อง

The construction of the reinforced concrete road in Ban Mae Malong, 9th Block, Mae Na Chon Subdistrict, with a traffic surface width of 4.00 meters, length of 75.00 meters and average thickness of 0.15 meters, or a total concrete area of not less than 300.00 square meters..pdf ไฟล์ PDF